Introduction of CPG Reliability and Durability Test Ability
CPG is the Secretariat of Automotive Reliability Technology Committee, SAE-China. We have experienced testing engineers and advanced testing instrumentation. We are able to collect and analysis vehicle loading dates, vehicle corrosion and disassemble analyze, user association with PG dates, digital PG, accurate monitoring management system of durability test and commissioned durability test. We have undertaken many testing requirements from known enterprise and become the reliability and durability testing base for them.
The durability test track including 7.8km high speed oval, fatigue track with more than 50 characteristic pavements, test hills with the slope from 3% to 40% and one winding road in 10%. The abundant types of pavement fully satisfied the requirement of customers from Europa, America, Japan, Korea and Chinese own brand.
In addition, we have vehicle load date acquisition system,vehicle humidity chambers, vehicle salt spray chambers, vehicle positioning and monitoring management system, which could be used for vehicle durability test and monitor the whole progress.
Attachment: Main Testing Capabilities
Main Testing Capabilities | |
Reliability Tests | Vehicle Road Durability Test |
Vehicle Load Date Collection | |
Formulate the Procedure of Reliability Test | |
Component Failure Analysis | |
Correlation between test and customer | |
Corrosion Tests | Vehicle Corrosion Test |
Vehicle Body Compound Salt Spray Test | |
Vehicle Disassembly and Evaluation | |
Other Tests | Vehicle Strength Test |
Virtual Proving Ground | |
According To Customer Requirements |
Contact Email: njcsyjs@catarc.ac.cn